Work Breakdown Structure (WBS)
You will be creating a work breakdown structure (WBS) for the sample project outlined in the handout below. For this assignment, you must include the following items utilizing one of the WBS starter formats provided:
- WBS that contains all deliverables identified in the project scope
- WBS coding for each WBS component
- Each level one component (except project management) will be broken down at least one additional level with a minimum of three components.
Complete this assignment in a Word document, using the project scope and guidelines outlined in the following handout: Lesson 4 Assignment Handout.docx
Instructions for submission: You have two options for creating your WBS:
Option 1: Create your WBS as a tree diagram.
Option 2: Create your WBS as an outline